      HYDROELECTRIC SECTOR
 
     
  COMPTROLLER
CONTRACTING ORGANIZATION
OBJECT
 
  MINISTRY OF MINES And ENERGY, NATIONAL COMMISSION OF EXEMPTIONS    
Financial and administrative Interventoría for the construction of the Plan of electrical interconnection for the Department of the Putumayo and harvesting and disposition treatment of toxic remainders.
 
  STUDIES Y DESIGNS
  COMPANY OF AQUEDUCT And SEWAGE SYSTEM OF BOGOTA, D.C. - EAAB     Studies of Prefeasibility Electrical Generacio'n in the Chingaza System - Sector Ventana  
  CHIVOR S.A. E.S.P    
Revision of the present operation of the spillway of the prey the Emerald
 
  CHIVOR S.A. E.S.P    
Compilation of underground structure information. Inspection of the load tunnel.
 
  CHIVOR S.A. E.S.P     Design of the recovery of the drainage gallery, Hydroelectric Power station of Chivor.  
  CHIVOR S.A. E.S.P    
Design superior Tunnel of load of the conduction of Chivor Limestone II-Reparacio'n sector. Hydroelectric power station of Chivor.

 

 

  CHIVOR S.A. E.S.P    
Studies and designs for the recovery and permanent reestablishment of the system of ventilation of the gallery of drainage of the pipe of load of the Hydroelectric Power station of Chivor
 
 

   
 
       
 